mon 13 jul 2009 08:44:30 witte de withstraat
construction postponed
the project to build a second shower in the apt has to wait — they discovered that the way is blocked by a gas pipe upstream of the meter. so before anything can happen, the gas people would have to come and re-route that pipe.